Operation Kitchen Overhaul… Started.

Emptied (ish) Kitchen

Emptied (ish) Kitchen

As the picture above basically explains, we’ve removed all of the doors from our little kitchen, pushed the fridge out into the dining/living room, and emptied the countertops and lower cabinets (doggy proofed!) so that we can start with this kitchen update.  That pic was taken August 4th, I can honestly report that kitchen things are still all over our house basically making our life even more chaotic.  Here’s the wishlist/to do list for the kitchen:

  • Prime, paint, and seal the cabinets.
  • Buy new hardware and add it to the cabinets (duh)
  • Paint the walls and ceiling
  • Re-do the countertop (either paint or re-laminate)
  • Replace the floor
  • Finally finish installing the big light
  • Replace the under cabinet light
  • Find a permanent solution for the trash and recycle bins
  • Make the upper corner shelf open shelving
  • Possibly replace the above-window light
  • Add some sort of curtains to the window and the door
  • Strip and repair the doors to the outside and to the basement
  • Paint the doors to the outside and the basement
  • Bright high glass white paint on the trim
  • Create a family command center on the big open wall that includes a calendar, mail center, meal planner, and anything else we may find useful.
  • Decorate.
  • Enjoy.

 

I am tired thinking about it.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s